Easington HIPPS Replacement

case study
about the project
TSG, in Q1 2016, awarded Lagoni a multi-disciplinary FEED study to determine the safety requirement through QRA and determine the mechanical, electrical, control & instrumentation and functional safety requirements (SIL).
 
Subsequently, Phase 2 of the project was also awarded to Lagoni and included multidiscipline detailed design to replace the existing inline valve, instrumentation and pipeline. It also included the design of a new HIPPS using a Schneider safety controller.
 
The activities on this project included:
• Formal process safety assessment, safety management plan / verification
• Functional safety activities: FSM Plan, HAZOP, QRA, SIL assessment
• CDM designers risk register
• Detailed design for the C&I, safety PLC, mechanical and LV electrical design for power distribution.